FitOutPermits.ae — Driven by Halo

Services

The approvals side of your fit-out, as a service.

Take the whole journey or the piece that's stuck. Every service runs with one accountable project manager, fixed fees, and government charges passed through at cost.

01

Fit-Out Permit Management

This is the core service: we take a fit-out project from 'which authority even governs this unit?' to a completion certificate in hand — one project manager, one document baseline, one track

02

Drawing Preparation & Engineering

Authorities approve drawings, not intentions. The single biggest driver of fast approvals is a coordinated, code-referenced, correctly-formatted drawing package — existing, demolition and pr

03

Fire & Life-Safety Approvals

Fire and life safety is the approval track that can't be charmed, rushed or worked around — and it shouldn't be. Dubai Civil Defence reviews every fit-out that touches detection, suppression

04

Landlord & Authority NOC Coordination

Every Dubai fit-out starts with a chain of consents before the first authority ever sees a drawing: the landlord's NOC, the building or community management's technical conditions, the maste

05

Building Completion Certificates

A fit-out isn't finished when the furniture arrives — it's finished when the completion certificate is issued. That document is what makes the unit legal to occupy, keeps trade-licence renew

06

Renovation & Modification Permits

Renovations carry a permit trap new-build fit-outs don't: the existing conditions. What was approved originally, what was changed since without paperwork, and what current code demands of an

07

Signage Permits

Signage is the small approval with outsized blocking power: stores physically ready to trade wait dark because the signboard — the last item on everyone's list — turned out to need municipal

08

Food Safety Approvals

Dubai Municipality's Food Safety Department reviews the layout of every food premises before it operates: receiving, storage, preparation, cooking, service and waste must flow without crossi

09

Approval Rescue & Regularisation

This service exists for the projects nobody advertises: the submission rejected three times, the application stalled since last year, the mezzanine built without approval, the inspection fai

10

White-Label Approvals for Firms

For fit-out contractors, interior designers and project managers, approvals are the profit leak that never shows on the tender: senior staff babysitting portals, programmes hostage to commen

Start with a free permit check

Send us the unit. We'll send back the map.

Location, current status, intended works — that's all we need. You get the authority map, document checklist, government-fee estimate and a fixed quote. Free, usually within one business day.